Metal Pavilion: Difference between revisions
Public wiki for the 1904 Louisiana Purchase Exposition
(Created page with "{{short description|Metal Pavilion}} {{Infobox FairBuilding | name = Metal Pavilion | image = Metal Pavilion.jpg | image_alt = | image_size = 300px | caption = | alternate_name = | location = Mining Gulch | no_buildings = 1 | construction_cost= | furnishing_cost = | profit = | owner = | architect = | dimensions = | adult_entry = | child_entry = | opening_...") |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{ | {{SHORTDESC:Metal Pavilion}} | ||
{{Infobox FairBuilding | {{Infobox FairBuilding | ||
| name = Metal Pavilion | | name = Metal Pavilion | ||
| image = Metal Pavilion.jpg | | image = Metal Pavilion.jpg | ||
| image_alt = | | image_alt = | ||
| image_size = | | image_size = 400px | ||
| caption = | | caption = | ||
| alternate_name = | | alternate_name = | ||
| location = [[Mining Gulch]] | | location = [[Mining Gulch]] | ||
| no_buildings = 1 | | no_buildings = 1 | ||
| construction_cost= | | construction_cost= $9,500 (${{Format price|{{Inflation|US|9,500|1904}}}} in {{Inflation/year|US}}) | ||
| furnishing_cost = | | furnishing_cost = | ||
| profit = | | profit = | ||
| owner = | | owner = | ||
| architect = | | architect = | ||
| dimensions = | | dimensions = 60' x 100' | ||
| adult_entry = | | adult_entry = | ||
| child_entry = | | child_entry = | ||
Line 26: | Line 26: | ||
==Description== | ==Description== | ||
A metallurgical laboratory with full equipment and | |||
in operation was installed and conducted in the Metal pavilion by the Colorado school of | |||
mines in addition to its modern assay office previously mentioned . Other exhibits in | |||
the Metal pavilion were welding process operations , smelting and refining copper , electro | |||
plating and zinc metallurgy processes and products. | |||
(francis) | |||
The roof was made of zinc tiles. | |||
exhibits illustrating electrical metallurgy and the smelting and refining of copper, zinc, lead and other metals and alloys. The method of working these metals is also illustrated | |||
The mining gulch | |||
The Houston Post | |||
26 Jun 1904, Sun · Page 25 | |||
==After the Fair== | ==After the Fair== | ||
Latest revision as of 07:59, 27 November 2022
![]() | |
Location | Mining Gulch |
---|---|
No. of Buildings | 1 |
Construction | |
Construction Cost | $9,500 ($286,513 in 2021) |
Architecture | |
Dimensions | 60' x 100' |
Before the Fair[edit | edit source]
Description[edit | edit source]
A metallurgical laboratory with full equipment and in operation was installed and conducted in the Metal pavilion by the Colorado school of mines in addition to its modern assay office previously mentioned . Other exhibits in the Metal pavilion were welding process operations , smelting and refining copper , electro plating and zinc metallurgy processes and products. (francis)
The roof was made of zinc tiles.
exhibits illustrating electrical metallurgy and the smelting and refining of copper, zinc, lead and other metals and alloys. The method of working these metals is also illustrated The mining gulch The Houston Post 26 Jun 1904, Sun · Page 25