Philippine Mining

Public wiki for the 1904 Louisiana Purchase Exposition
Philippine Mining
File:Philippine Mining.jpg
LocationPhilippine Exhibit
No. of Buildings1
Construction
Construction Cost$1,460 ($44,033 in 2021)


Before the Fair[edit | edit source]

Description[edit | edit source]

After the Fair[edit | edit source]

See also[edit | edit source]

Notes[edit | edit source]

References[edit | edit source]

External links[edit | edit source]