Philippine Mining

Public wiki for the 1904 Louisiana Purchase Exposition
Philippine Mining
File:Philippine Mining.jpg
LocationPhilippine Exhibit
No. of Buildings1
Construction
Construction Cost$1,460 ($44,033 in 2021)


Before the Fair

Description

After the Fair

See also

Notes

References

External links